The new Pharmacy IV room is a state-of-the-art facility with anteroom and clean room areas, new hoods, air-lock pass through and other features that enable the production of IV products in a modern, efficient and ultra-clean environment.
View all Projects for Methodist Hospital »To address the increased volume in Radiology services at Methodist Hospital, Phila., PA, a second inpatient MRI and Nuclear Camera were installed in 2012.
Relocation of multiple functions were required to provide the space needed to expand the existing MRI and Nuclear Camera capabilities.
An underutilized ICCU dating to the 1980's was converted to an Ambulatory Procedure Unit . Program allows outpatients to arrive at the APU, prepare for surgery, transported to the adjacent OR suite without leaving the confines of the OR suite. Patients are then returned to the APU and discharged.
View all Projects for Methodist Hospital »Major changes to the decades old main entrance to Methodist Hospital in South Philadelphia were undertaken in 2010. The major feature of the project is the 110 foot long skylight installed from the entrance to the lobby, bringing natural light to an internal area of the hospital.
View all Projects for Methodist Hospital »To address the increased volume in Radiology studies at Methodist Hospital, a second MRI unit and Nuclear Camera were installed in 2012. Relocation of multiple functions were required to provide space for to expand the existing MRI and Camera suites.
View all Projects for Methodist Hospital »To address the need for expanded surgical procedures, the existing OR suite was expanded onto the roof of an adjoining building to add one new Orthopaedic OR with laminar Hood, a second 600 SF future OR space and expanded storage for the entire OR suite. Construction was completed with virtually no interference to the operations of the OR, with a seamless corridor connection.
View all Projects for Methodist Hospital »As part of overall upgrading of the OR suite in 2008, four new Operating rooms, upgrading of three additional OR’s were completed. In addition, new Pre-op and Post Op (PACU) spaces were included for 16 to 20 patients. A smaller Stage II Recovery for Hand Surgery was included.
View all Projects for Methodist Hospital »Total demolition of the existing cafeteria at Methodist Hospital resulted in anew modern facility with emphasis on natural light, and colorful interiors.
View all Projects for Methodist Hospital »CVIR (Cardiovascular Interventional Radiology) were implemented at Methodist Hospital in 2011. Project included new Treatment room, staff area and major improvements to the equipment and monitoring areas.
Storage area and underutilized laboratory space allowed construction of two new state of the art Orthopeadic Operating Rooms
View all Projects for Nazareth Hospital »Addressing the need for upgraded Orthopaedic Operating room, Riddle Hospital in Media PA constructed two new surgical suites, in addition to a major upgrade of Pre OP and POST up facilities.
View all Projects for Riddle Memorial Hospital »